Skip to content

[release-1.14] Fix Spark E2E image builds with Docker-backed Minikube - #5991

Merged
volcano-sh-bot merged 2 commits into
release-1.14from
copilot/release-114-fix-spark-e2e-image-builds
Sep 17, 2026
Merged

volcano-sh-bot merged 2 commits into
release-1.14from
copilot/release-114-fix-spark-e2e-image-builds

Conversation

Copilot AI commented Sep 16, 2026 •

Copy link
Copy Markdown
Contributor

Spark E2E image builds rely on minikube docker-env, which fails against Minikube’s incomplete containerd Docker-compatible endpoint.

  • Minikube runtime
    • Explicitly use Docker while preserving the release branch’s existing build and deployment flow.
    • Document the runtime requirement alongside startup configuration.
minikube start --cpus max --memory max --container-runtime=docker

@volcano-sh-bot volcano-sh-bot added do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress. size/XS Denotes a PR that changes 0-9 lines, ignoring generated files. labels Sep 16, 2026
Copilot AI linked an issue Sep 16, 2026 that may be closed by this pull request
Co-authored-by: JesseStutler <38534065+JesseStutler@users.noreply.github.com>
Copilot AI changed the title [WIP] Fix Spark E2E image builds with Docker-backed Minikube [release-1.14] Fix Spark E2E image builds with Docker-backed Minikube Sep 16, 2026
Copilot AI requested a review from JesseStutler September 16, 2026 08:58
@JesseStutler
JesseStutler marked this pull request as ready for review September 16, 2026 09:29
@volcano-sh-bot volcano-sh-bot removed the do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress. label Sep 16, 2026
@JesseStutler

Copy link
Copy Markdown
Member

/approve
/lgtm

@volcano-sh-bot volcano-sh-bot added the lgtm Indicates that a PR is ready to be merged. label Sep 17, 2026
@volcano-sh-bot

Copy link
Copy Markdown
Contributor

[APPROVALNOTIFIER] This PR is APPROVED

This pull-request has been approved by: JesseStutler

The full list of commands accepted by this bot can be found here.

The pull request process is described here

Details Needs approval from an approver in each of these files:

Approvers can indicate their approval by writing /approve in a comment
Approvers can cancel approval by writing /approve cancel in a comment

@volcano-sh-bot volcano-sh-bot added the approved Indicates a PR has been approved by an approver from all required OWNERS files. label Sep 17, 2026
@volcano-sh-bot
volcano-sh-bot merged commit ee9fb6d into release-1.14 Sep 17, 2026
19 of 21 checks passed
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

approved Indicates a PR has been approved by an approver from all required OWNERS files. lgtm Indicates that a PR is ready to be merged. size/XS Denotes a PR that changes 0-9 lines, ignoring generated files.

Projects

None yet

Development

Successfully merging this pull request may close these issues.

[release-1.14] Fix Spark E2E image builds with Docker-backed Minikube

3 participants