Milestones
List view
**Goal:** Protect the itch.io deploy path, make the security scans check the build players actually get, and scan the workflows themselves. This sits between Milestone 27.5 and Milestone 28: after 27.5, so the build and deploy changes start from its new presets and player page, and before 28's feature work. **Epic:** #1227 ### Phase 1: Safety net 1. #1228 Staging target on itch.io for testing deploy changes 2. #1229 Turn on secret scanning push protection ### Phase 2: Protect the deploy path 3. #1230 Least-privilege permissions in the main CI/CD pipeline 4. #1231 Move the itch.io deploy secrets into the itch-production Environment, main only 5. #1232 Lock down the deploy job: pinned cache, butler verified on every run, no inline inputs 6. #1233 Split the deploy into a build job and a key-only push job ### Phase 3: Scan what ships 7. #1234 CodeQL scans the deployed web build and gates the push 8. #1235 Fix Snyk: scan the Python dependencies and the CI Docker image, outside the deploy path 9. #1236 Trivy cleanup: scan the triggering commit, cover requirements-docs.txt, block only on secrets 10. #1239 Harden patch_index_js.sh: fail loudly when a threaded export lacks the pattern ### Phase 4: Scan the workflows and PRs 11. #1240 Scan the workflows: zizmor with online audits, and CodeQL for GitHub Actions 12. #1241 Pin every remaining action to a commit SHA and fix the wrong version comments 13. #1242 Move every remaining ${{ }} expression out of run: blocks 14. #1243 Security checks on every PR: Trivy, dependency review and required code scanning results 15. #1244 Dependabot for pip and Docker, with a cooldown, and remove the stale ignore rule 16. #1245 Document what PRODUCTION_SALT protects, and what it doesn't ### Phase 5: Expand scanner coverage 17. #1237 CodeQL for the repo's Python: CI scripts, tests, benchmark and workspace tools 18. #1238 OpenSSF Scorecard: weekly security-practices score in the Security tab Sub-tasks are listed here as they're created. ### Done when - [ ] The itch.io API key exists only in a push job that runs no third-party actions - [ ] CodeQL scans the exact build that gets deployed - [ ] CodeQL scans the repo's Python as well as the web build - [ ] zizmor reports no errors on any workflow - [ ] Security scans run on PRs as well as on `main` - [ ] Every deploy change was tested on staging before it reached players
Due by January 16, 2027•0/19 issues closed**Goal:** Separate the Playwright-only web overlay and JS callbacks from production builds, so players get the shell and game without test hooks. Clean up the JS layer first, so the separation changes code that is already consistent and testable. This sits between Milestone 27, whose menu work leaves its JS cleanup to this milestone, and Milestone 28's 3D work, so the benchmark baselines show the separation as its own step. **Epic:** #1184 ### Phase 1: Cleanup (first days of the sprint) 1. #1185 Shared `JsArgs` helper and the `advanced_settings` validator fix (#621) 2. #1186 Consistent wrapper use, so web checks can be mocked in GUT and gdUnit4 3. #1187 `audio_web_bridge.gd` cleanup: duplicate sync, callback table, batched `eval()`, DOM IDs in one place 4. #1188 Typed telemetry signal; the web check moves from `main_scene.gd` into `setup()` (after #1151) ### Phase 2: Build split 5. #1189 Test page and `Web_test` preset for Playwright in CI; `Web_thread_off` becomes the local test preset 6. Test-only JS only in test builds (`ci`): 6a #1190 `AudioWebBridge`, 6b #1191 settings menus, 6c #1192 main menu, pause menu, Globals and fuel telemetry 7. #1193 Player page without test buttons, with a drift check against the test page. Export filters stay as they are. Keep the GPU warning modal, loading screen, boot scripts and the itch.io quit redirect. Must land before #647 (custom HTML5 boot splash), which edits `custom_shell.html`. ### Done when - [ ] The production export has no test overlay and no `window.*` test callbacks - [ ] The GPU warning modal, loading screen and itch.io quit redirect still work in production - [ ] Full GUT, gdUnit4 and Playwright suites pass on both test builds (`Web_test` in CI, `Web_thread_off` locally), with no test cases dropped - [ ] Every preset and flow checked in each Phase 2 sub-task (see the table in #1189) - [ ] The benchmark table shows no regression
Due by December 19, 2026•0/10 issues closed- Due by November 20, 2027
- Due by November 6, 2027
- Due by October 23, 2027
- Due by October 9, 2027
- Due by September 25, 2027•0/6 issues closed
- Due by September 11, 2027•0/7 issues closed
- Due by August 28, 2027
- Due by August 14, 2027
- Due by July 31, 2027•0/1 issues closed
- Due by July 17, 2027•0/1 issues closed
### Overview This sprint shifts focus back to the Godot 4.5 client to build the architectural foundation of the upgrade progression loop. To keep the workload highly manageable while learning the system, this phase implements a strict "vertical slice" focusing entirely on the base Hangar scene and a single upgrade tree: the primary nose battery. ### 🎯 Key Deliverables * **Hangar Scene & Sprite Hierarchy:** Create `hangar_hub.tscn` and implement a modular sprite node structure for the P-38 Lightning, ensuring individual components can be isolated and modified dynamically. * **Upgrade State Management:** Develop `upgrade_manager.gd` to handle the data dictionaries for item tiering and costs, cleanly hooking into the existing local encrypted save system on boot. * **Interactive UI & Purchase Logic:** Construct the upgrade selection panels utilizing existing custom `JuicyButton` architecture, ensuring currency checks, error handling, and local profile serialization happen instantly on press. * **Dynamic Feedback & Verification:** Configure the signaling system to dynamically swap textures when an upgrade is unlocked, paired with automated GUT unit tests to verify the purchase math is completely break-proof. ### 🛑 Out of Scope for this Sprint * Expanding other ship tech trees such as Engines, Hull, Shields, or Avionics (See Phase 6.2). * Connecting the local Hangar save dictionary to the live remote Django database (See Phase 6.3). * Integrating the upgraded weapon stats into the live combat/gameplay scenes.
Due by July 3, 2027•0/7 issues closed### Overview This sprint covers the final two weeks of the Authentication phase. The objective is to bridge the gap between the Godot 4.5 client and the Django backend. This involves establishing secure communication, handling authentication tokens, and officially deploying the containerized backend to the live Oracle Free Tier server. ### 🎯 Key Deliverables * **Django API & Security**: Configure JWT (JSON Web Token) authentication to securely verify registered players and manage login sessions * **Godot REST Client:** Build the `api_client.gd` autoload. Wire up `HTTPRequest` nodes to send asynchronous JSON payloads for user registration, login, and token storage. * **Oracle Deployment:** Deploy the Dockerized Django application and MySQL database to the live Oracle Free Tier instance, ensuring ports are configured and the server is accessible. * **Network Edge Cases:** Implement robust error handling in the Godot client. If the server times out or WebGL network policies block the request, the game must gracefully fall back to the offline "Guest Mode." ### 🛑 Out of Scope for this Sprint * Building the UI for the Hangar Hub (See Phase 6). * Implementing the actual airplane upgrade logic and tech trees (See Phase 6).
Due by June 19, 2027•0/9 issues closed### Overview This sprint shifts focus entirely away from the Godot client and into the new backend repository. The goal over these two weeks is to establish a secure, containerized Django environment. This acts as the foundational infrastructure for the game's REST API and prepares the repository for cloud deployment. ### 🎯 Key Deliverables * **Project Initialization:** Set up the base Django project with Django REST Framework (DRF) and instantly configure a Custom User model before any migrations are run. * **Docker Environment:** Create a `docker-compose.yml` and `Dockerfile` to run the Django API alongside a local MySQL database for seamless, reproducible local development. * **Security & Configuration:** Implement 12-Factor App standards using `django-environ` to ensure no secrets or database credentials are ever hardcoded into the public repository. * **CI/CD Pipeline:** Configure GitHub Actions to automatically run linters and security scanners on every pull request. ### 🛑 Out of Scope for this Sprint * Building the actual gameplay/save-data endpoints (e.g., syncing Hangar upgrades). * Connecting the Godot 4.5 client to the backend (See Phase 5.3). * Deploying the live container to the Oracle Free Tier (See Phase 5.3).
Due by June 5, 2027•0/8 issues closed### Overview This sprint covers the first two weeks of the Authentication phase. The primary goal is to build the visual interface in Godot 4.5 and fully implement the "Play as Guest" offline flow. This ensures the game remains immediately playable for casual web users without waiting on the cloud backend to be completed. ### 🎯 Key Deliverables * **Login & Registration UI:** Design `login_screen.tscn` using the Tween-based architecture established in Phase 1 (Juicy buttons, staggered containers). * **Guest Mode Hook:** Wire up the "Play as Guest" flow to bypass network authentication. This will directly utilize the existing encryption system to create, save, and load a local offline profile. * **State Management:** Implement the routing logic to cleanly transition the player from the Main Menu -> Login Screen -> Hangar Hub based on their authentication state. ### 🛑 Out of Scope for this Sprint * Django backend initialization and Docker setup (See Phase 5.2). * Oracle Free Tier deployment, REST API integration, and JWT handling (See Phase 5.3).
Due by May 22, 2027•0/8 issues closed- Due by May 8, 2027•0/8 issues closed
- Due by April 24, 2027•0/9 issues closed
- Due by April 10, 2027•0/9 issues closed
- Due by March 27, 2027•0/6 issues closed
- Due by March 13, 2027•0/6 issues closed
- Due by February 27, 2027•0/5 issues closed
- Due by February 13, 2027•0/9 issues closed
## ✅ **Milestone 28 – 3D Asset Integration & Visual System Setup** **This milestone introduces and integrates the primary 3D asset into the game, establishing the rendering, animation, and scene pipeline required for in-game usage.** The focus is on preparing the model for production use by validating animations, aligning visuals with gameplay systems, and ensuring correct rendering through a dedicated viewport architecture. ### Key Areas * Inspect and validate imported 3D model and animation data * Ensure proper license compliance and update project credits * Prepare asset pipeline and scene structure for integration * Implement SubViewport-based rendering for controlled display * Calibrate visuals (scale, lighting, orthographic consistency) * Integrate core animations (movement, rotor, landing gear) * Align hitboxes and weapon systems with the visual model ### Outcome By the end of this milestone, the 3D model will be **fully integrated, visually calibrated, and functionally aligned with gameplay systems**, providing a solid foundation for future visual and gameplay enhancements. ### Task list Task 1: 3D Model Inspection & Animation Validation Task 2: License Compliance and Credits Update Task 3: Asset Pipeline & Scene Preparation Task 4: SubViewport Architecture Integration Task 5: Visual Calibration (Orthogonal Scale & Lighting) Task 6: Dynamic Movement Animation (Banking) Task 7: Rotor Animation Integration Task 8: Landing Gear Animation Integration Task 9: Hitbox and Weapon Realignment
Due by January 30, 2027•0/13 issues closed**Goal:** Finish the auto-mute feedback work, then act on the #624 architecture review findings, layer by layer, with performance measured before and after the refactor. Before the refactor PRs, make the CI benchmark baselines maintain themselves, so every Region PR shows its benchmark table before merge and Milestone 28's feature work starts with them in place. ### Phase 1: Audio feedback (one PR) - #1075 Master feedback hold cut short during `MUTE_HARDWARE_DELAY` - #1047 Keep the auto-mute confirmation click audible for SFX and SFX_Menu Both change the same hold logic in `AudioManager.change_volume()`: one per-bus hold counter, separate commits per issue. ### Phase 2: Preparation - #726 Public diagnostic helpers on `SfxManager`; decouple the SFX test suite (separate PR, before Region 4) - #1079 Performance baseline (Part 1), captured before any Region PR merges ### Phase 3: Automatic benchmark baselines (#1107) Baselines that ratchet down on confirmed gains, an accept label for intended regressions, and benchmark runs on PRs. Design doc in #1107. - #1108 Refresh the CI baselines from the first `main` run after #1098. Do this first: it protects #1098's gains during the remaining Region PRs. - #1109 Baseline rules in `compare.py` (in parallel with #1108) - #1110 Create and seed the `benchmark-baselines` branch (needs #1108, #1109) - #1111 `benchmark_baselines.yml`: gate, update and accept path (needs #1109, #1110) - #1112 Benchmark runs on PRs, report-only (needs #1111) - #1113 Remove the committed baselines and update the guide (needs #1111, #1112) ### Phase 4: Architecture refactor (#624 findings) Lowest layer first, so the order doesn't follow region numbers: 1. #616 Region 1: Core architecture & global state (done in #1098) 2. #617 Region 2: Custom resources & persistence 3. #619 Region 4: Subsystem managers (adds the AudioManager hierarchy API that Regions 3 and 6 use) 4. #1101 Settings owns its state (fixes #619's device-tracking finding) 5. #1102 Bindings API (needs #1101; fixes #620's per-frame polling and two #621 findings) 6. #618 Region 3: System abstractions & web interop 7. #620 Region 5: Gameplay entities & main scene 8. #621 Region 6: Presentation & UI layers - #622 Region 7: Addons. Scope no longer exists in the repo; closed as not planned. **Fixes that span regions** (one PR each): - **Fuel mirror cleanup:** #1142 (done: fuel tests moved to FuelResource), then #1143 (remove runtime fuel state and the player's global write). Covers #620's player fuel mirror and #617's `current_fuel`. The disk save itself was stopped in #1098 (#616). - **Web overlay restore:** #1165. Covers `restore_options_menu_dom` (#618) and Controls → Back overlays (#621), both via `OPTIONS_MENU_OVERLAY_IDS`. Test-only code. Before starting each region, re-verify its checklist against current `main`. The findings were made at `5315844`, and some are already resolved. ### Phase 5: Validation - #625 Performance validation (Part 2): rerun the #1079 benchmark and compare ### Done when - [ ] All issues closed or explicitly moved to a later milestone - [ ] Full GUT, gdUnit4 and Playwright suites pass - [ ] #625 comparison posted; any metric more than 5% worse is explained or filed as a follow-up - [ ] #1107 done: `main` runs update `benchmark-baselines` themselves, and PRs show the benchmark table
Due by December 5, 2026•113/124 issues closed