Skip to content

chore: release v0.8.212 - #6660

Merged
miguel-heygen merged 1 commit into
mainfrom
release/v0.8.212
Oct 28, 2026
Merged

miguel-heygen merged 1 commit into
mainfrom
release/v0.8.212

Conversation

@miguel-heygen

Copy link
Copy Markdown
Collaborator

What changed

Release v0.8.212: the version bump for all 14 packages and the 5 plugin manifests, the release notes and the changelog entry.

This PR also corrects the v0.8.211 notes (releases/v0.8.211.md and its changelog entry). The published 0.8.211 contains 17 changes its notes did not list, because its release PR merged through the queue onto a main that had moved: renders encode while capturing, cloud renders stitch in parallel, more capture workers on Macs with a GPU, one remote download per render, the audio mix running alongside browser start-up, drawElement films keeping their workers, Windows renders opening no console windows, Windows undo and redo on a held file, a named reason for a choppy preview, and more. They are now listed, in plain words.

What I measured

  • bun run release:prepare 0.8.212 --from v0.8.211 on a full clone drafted the notes from the 11 commits since v0.8.211; I wrote the summary and left the generated lines as they are. It then set 14 packages and 5 plugin manifests to 0.8.212, with --no-tag because the workflow tags.
  • The commit hooks (format, commitlint, tracked artifacts) pass.
  • The v0.8.211 correction was checked against git log v0.8.210..v0.8.211 (the real tag range), where the first notes were checked against the range the PR opened with.

What I did NOT exercise

  • The publish: the workflow tags and publishes after the merge, so npm is unchecked until then. The 0.8.211 publish ended red on one package's signing-log entry (a transient 409) and needed one rerun of the failed job.

Proposed, not built: notes generated from the real range

The 0.8.211 notes were written against the range at PR-open time and the queue then merged the release commit onto a later main. Two places could own the fix, and I would pick the second:

  1. In release:prepare, regenerate at merge time: not possible there, because the script runs before the queue.
  2. A check on the release PR and again on the merge-group run: list the commits from the last tag to the base of the merge group, and fail if any change in that range is missing from releases/vX.md. It sees the range as the queue will tag it, and it fails the PR in the queue instead of after the publish.

Want it built? It is a small script plus one CI step, and it needs your call on whether a miss should fail the queue.

No visible change

A version bump, release notes and a changelog entry; nothing here changes what the studio or the player shows.

@mintlify

mintlify Bot commented Oct 28, 2026 •

Copy link
Copy Markdown

Preview deployment for your docs. Learn more about Mintlify Previews.

Project Status Preview Updated
hyperframes 🟢 Ready View Preview Oct 28, 2026, 12:05 PM

💡 Tip: Enable Automations to automatically generate PRs for you.

@heygengenesis heygengenesis Bot left a comment

Copy link
Copy Markdown
Contributor

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

Verdict: APPROVE · 0 blocker · 0 important · 1 nit · f644e31

  • nit: the 17 v0.8.211 bullets added in both releases/v0.8.211.md and the mdx entry have no commit or PR links. Every other generated bullet links both (e.g. #6631, #6643, #6616).
Scope

The head's parent is origin/main (85efaec), so the notes match the range the queue will tag. All 11 commits in v0.8.211..main are listed in releases/v0.8.212.md and the mdx <Update>. The v0.8.211 correction covers all 17 commits in the real v0.8.210..v0.8.211 tag range that were missing: 2 features, 6 fixes, 9 perf. All 14 non-private packages and the 5 plugin manifests are bumped 0.8.211 → 0.8.212. CI, regression, Windows render verification and every other workflow on this head are green. I'm leaving the proposed range check in the body for a human to decide.

@heygengenesis heygengenesis Bot left a comment

Copy link
Copy Markdown
Contributor

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

Verdict: APPROVE · 0 resolved, 0 open, 0 new · f644e31 → c748722

Rebuilt on main (2d3033c). The 13 PRs in v0.8.211..main each appear once in releases/v0.8.212.md and once in the mdx entry, including the new #6639 and #6656. All 14 packages and 5 manifests are at 0.8.212, and every workflow on this head is green. The earlier nit still stands: the corrected v0.8.211 bullets have no links.

@miguel-heygen
miguel-heygen added this pull request to the merge queue Oct 28, 2026
Merged via the queue into main with commit eba596d Oct 28, 2026
70 checks passed
@miguel-heygen
miguel-heygen deleted the release/v0.8.212 branch October 28, 2026 12:53

This branch was successfully deployed

1 active and 1 inactive deployments
npm-publish — c7487226 Deployed Oct 28, 2026 by miguel-heygen via Publish #5330
staging - docs — c7487226 Deployed Oct 28, 2026 by mintlify[bot]
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant