Milestones
List view
- No due date
- No due date•0/2 issues closed
First stable 1.0. Includes Google Drive adapter (#12) and simple Web UI (#9) among others (scope may grow).
No due date•0/3 issues closedPlanned release slot (scope TBD). Was v0.9.0; shifted +1 minor for v0.4.0 ship.
No due datePlanned release slot (scope TBD). Was v0.8.0; shifted +1 minor for v0.4.0 ship.
No due datePlanned release slot (scope TBD). Was v0.7.0; shifted +1 minor for v0.4.0 ship.
No due datePlanned release slot (scope TBD). Was v0.6.0; shifted +1 minor for v0.4.0 ship.
No due dateWas v0.5.0; shifted +1 minor for v0.4.0 ship. Scope includes docs site (#47), Go rewrite (#24), logging/retention (#23).
No due date•0/2 issues closedWas v0.4.0; shifted +1 minor for v0.4.0 ship. Scope: #42 devcontainer → #40 docs drift → #5 upload retry → #4 scanner abstraction. Base: dev-v0.5.0
No due date•0/3 issues closed