Skip to content

fix(coalesce): size copied view blocks per output batch - #12307

Open
JoeryH wants to merge 1 commit into
apache:mainfrom
JoeryH:coalesce-view-block-sizing
Open

JoeryH wants to merge 1 commit into
apache:mainfrom
JoeryH:coalesce-view-block-sizing

fix(coalesce): size copied view blocks per output batch

14ad9d7
Select commit
Loading
Failed to load commit list.
Sign in for the full log view
GitHub Actions / CI (fork) succeeded Nov 17, 2026 in 20m 54s

Fork CI: success

CI run on JoeryH/arrow-rs for 14ad9d7.

Rerun failed checks in the fork. A green fork run tests the branch head, not its merge with main.

This check is informational: the contributor controls the fork workflow. The upstream merge queue runs the required CI checks on the proposed merge result. Active or missing runs on recently updated PRs are polled every 15 minutes; a rotating sweep also discovers reruns on older PRs. Scheduled updates may be delayed.

Details

{"head_sha":"14ad9d70b01eae9f5529f8e97af4cdf87466e3c4","run_id":44184521692,"run_attempt":1}