A fully open-source implementation of a 1.2 V temperature-stable Bandgap Reference — from first principles to LVS-verified layout — using the SkyWater 130nm process.
| Parameter | Result | Spec |
|---|---|---|
| V_REF (TT, 27°C) | 1.2358 V | ~1.2 V |
| Tempco (ideal op-amp) | 33–35 ppm/°C | < 50 ppm/°C ✅ |
| Tempco (FF corner) | ~10 ppm/°C | < 50 ppm/°C ✅ |
| Tempco (SS corner) | ~45 ppm/°C | < 50 ppm/°C ✅ |
| Startup time | < 1 µs | < 2 µs ✅ |
| LVS | ✅ Pass | Pass |
- Why a Bandgap Reference?
- The Core Idea — CTAT + PTAT Cancellation
- Circuit Architecture
- Design Decisions — The Why
- Device Sizing and Specifications
- Tools and PDK Setup
- SPICE Netlist Guide
- Pre-Layout Simulation Results
- Physical Layout
- LVS Verification
- Key Takeaways
- References
A Bandgap Reference (BGR) is one of the most fundamental blocks in analog IC design — virtually every mixed-signal SoC contains one. Its job is to produce a precise, stable DC voltage that does not change with temperature, supply voltage, or process variation.
Every block that needs accuracy — LDOs, ADCs, DACs, PLLs, DC-DC converters — traces its precision back to a BGR. Getting the BGR wrong degrades the accuracy of everything downstream.
The challenge is that every on-chip voltage source has some temperature dependence:
| Source | Tempco | Problem |
|---|---|---|
| Resistor divider from VDD | 0 ppm/°C (of VDD) | 100% supply sensitivity |
| Single forward-biased diode | ~−3142 ppm/°C | Too temperature sensitive |
| Zener diode | Low, but needs special process | Not available in standard CMOS |
| Bandgap Reference | 10–50 ppm/°C | ✅ Best of all worlds |
The insight: Instead of fighting temperature dependence, use two voltages with opposite temperature slopes and cancel them.
The BGR exploits two physical quantities that exist in every BJT:
CTAT — V_BE decreases with temperature (~−2 mV/°C)
The base-emitter voltage of a BJT biased at constant current follows:
V_BE(T) ≈ V_G0 − (V_G0 − V_BE0) × (T/T0) + higher order terms
At room temperature this simplifies to approximately −2 mV/°C — the dominant CTAT term.
PTAT — ΔV_BE increases with temperature (+0.085 mV/°C × ln N)
When two BJTs operate at different current densities (emitter area ratio N):
ΔV_BE = V_T × ln(N) where V_T = kT/q
Since V_T = kT/q is directly proportional to absolute temperature, ΔV_BE rises linearly — pure PTAT.
Cancellation gives V_REF ≈ 1.2 V
V_REF = V_BE + (R2/R1) × V_T × ln(N)
Setting dV_REF/dT = 0:
R2/R1 = |dV_BE/dT| / [ln(N) × k/q]
= 2 mV/°C / [ln(8) × 0.0857 mV/°C]
≈ 8
The resulting V_REF converges to ~1.205 V — the silicon bandgap energy extrapolated to 0 K.
Intuition: At 0 K, all thermal energy disappears — V_T → 0 so the PTAT term vanishes, leaving only V_BE(0K) = V_G0 ≈ 1.205 V. The cancellation condition forces V_REF to exactly this value regardless of temperature.
A diode-connected PNP BJT (sky130_fd_pr__pnp_05v5_W3p40L3p40) biased at a constant current gives a falling V_BE of approximately −1.88 mV/°C — the CTAT component.
Why PNP and not a simple diode? The PNP BJT provides better matching, lower noise, and a more predictable temperature coefficient than a plain diode. Sky130 provides a native PNP device optimised for exactly this application.
Two branches carry equal currents, but Q2 has 8× the emitter area of Q1. This creates a differential V_BE across resistor R1 that is purely proportional to temperature:
V_R1 = ΔV_BE = V_T × ln(8) = 26 mV × 2.079 = 54 mV (at 300 K)
Why N = 8? N = 8 gives a well-matched PTAT slope, fits neatly in a 2×4 common-centroid BJT array, and produces moderate resistor values — the optimal balance between slope, layout area, and current consumption.
Instead of referencing bias current to a resistor from VDD (100% supply sensitivity), the SBCM bootstraps I_out to define I_REF. Since both currents come from the same mirror, VDD changes affect them identically and cancel — giving first-order supply independence.
The zero-current problem: I = 0 also satisfies the SBCM equations. This is the degenerate bias point — the mirror cannot self-start from zero current. A startup circuit is mandatory.
A third PMOS MP3 mirrors the bias current into the reference branch: R2 in series with Q3:
V_REF = V_BE(Q3) + I × R2 = CTAT + PTAT
Both R1 and R2 use the same RPOLYH device, so their tempcos track — the ratio R2/R1 is nearly temperature-independent, making V_REF insensitive to resistor tempco.
Phase 1 — Power-on kick: At t = 0, all currents = 0. MP4 pulls net6 toward VDD. MP5 detects the zero-current state and injects current into net1, turning on MN1/MN2 and kicking the SBCM into its correct operating point.
Phase 2 — Auto turn-off: Once V_REF is established, net6 drops to its correct bias level → MP5 turns off automatically → the startup path disconnects completely and never disturbs V_REF in steady state.
Why long-channel NMOS (L = 7 µm) for startup? Long L keeps off-state leakage extremely low — the startup path draws negligible current once the circuit is running.
| Block | Devices | Role |
|---|---|---|
| Startup | MP4, MP5, MN3, MN4 | Kick SBCM out of zero-current state |
| SBCM | MP1, MP2, MN1, MN2 | Supply-independent current generation |
| CTAT branch | Q1 (1× BJT) | Falling V_BE provides CTAT |
| PTAT branch | R1 (5 kΩ), Q2 (8× BJT) | Rising ΔV_BE provides PTAT |
| Reference branch | MP3, R2 (33 kΩ), Q3 (1× BJT) | Sums CTAT + PTAT → V_REF |
| Decision | Choice | Reason |
|---|---|---|
| BJT emitter ratio N | 8 | Maximises PTAT slope with compact 2×4 common-centroid array |
| PMOS channel length | L = 2 µm | Long L reduces channel-length modulation → better mirror accuracy |
| NMOS channel length | L = 1 µm | Sub-threshold operation; long enough to avoid short-channel effects |
| Startup NMOS length | L = 7 µm | Extremely low off-state leakage — startup path fully invisible in steady state |
| Resistor type | RPOLYH | Lowest mismatch, predictable tempco, available in Sky130 |
| R1 and R2 same device | Yes | Tempcos cancel in the ratio — V_REF insensitive to resistor tempco |
| PMOS multiplicity | M = 4 | Four fingers → better matching and lower systematic current mismatch |
| VDD | 2.0 V | Sufficient headroom for PMOS saturation + V_BE + R1 voltage drop |
| Parameter | Target | Achieved |
|---|---|---|
| Supply Voltage | 2.0 V | 2.0 V |
| V_REF | ~1.2 V | 1.2358 V ✅ |
| Tempco | < 50 ppm/°C | 33–35 ppm/°C ✅ |
| Temperature Range | −40°C to +125°C | −40°C to +125°C ✅ |
| Startup Time | < 2 µs | < 1 µs ✅ |
| LVS | Pass | ✅ Pass |
| Device | Model | Parameters |
|---|---|---|
| PNP BJT | sky130_fd_pr__pnp_05v5_W3p40L3p40 |
Area = 11.56 µm², β ≈ 12 |
| PFET LVT | sky130_fd_pr__pfet_01v8_lvt |
L=2µm, W=5µm, M=4 |
| NFET LVT | sky130_fd_pr__nfet_01v8_lvt |
L=1µm, W=5µm, M=8 |
| RPOLYH | sky130_fd_pr__res_high_po_1p41 |
W=1.41µm, L=7.8µm → ~2 kΩ/unit |
| Component | Value | Implementation |
|---|---|---|
| R1 | 5 kΩ | 2 units series + 2 parallel |
| R2 | 33 kΩ | 16 units series + 2 parallel |
| Q1 | 1× BJT | Single unit cell |
| Q2 | 8× BJT | 8 units in parallel (common-centroid array) |
| Q3 | 1× BJT | Single unit cell |
| Tool | Purpose |
|---|---|
| ngspice | Pre-layout SPICE simulation |
| Magic VLSI | Physical layout and DRC |
| Netgen | LVS verification |
| SkyWater Sky130 PDK | Process design kit |
# ngspice
sudo apt-get install ngspice
# Magic VLSI
wget http://opencircuitdesign.com/magic/archive/magic-8.3.32.tgz
tar xvfz magic-8.3.32.tgz && cd magic-8.3.32
./configure && sudo make && sudo make install
# Netgen
git clone git://opencircuitdesign.com/netgen
cd netgen && ./configure && sudo make && sudo make install
# SkyWater Sky130 PDK
git clone https://github.com/google/skywater-pdk-libs-sky130_fd_pr.git
git clone https://github.com/silicon-vlsi-org/eda-technology.gitFirst Principles → CTAT / PTAT characterization
↓
Ideal BGR (VCVS) → Concept validation (33–35 ppm/°C achieved)
↓
Complete BGR → SBCM + startup circuit
↓
Process Corners → FF / TT / SS verification
↓
Physical Layout → Magic VLSI (common-centroid, guard rings)
↓
LVS Verification → Netgen ✅ Pass
| Rule | Detail |
|---|---|
| Line 1 is always a comment | ngspice treats it as the title — never as a component |
X prefix on all Sky130 devices |
All devices are subcircuit calls |
.end is mandatory |
Netlist is silently ignored without it |
Corner = one .lib tag change |
Everything else in the netlist stays identical |
* PNP BJT — Collector Base Emitter
xqp1 gnd net1 net1 sky130_fd_pr__pnp_05v5_W3p40L3p40 m=1
* PFET — Drain Gate Source Bulk
xmp1 net1 net2 vdd vdd sky130_fd_pr__pfet_01v8_lvt l=2 w=5 m=4
* NFET — Drain Gate Source Bulk
xmn1 net2 net3 gnd gnd sky130_fd_pr__nfet_01v8_lvt l=1 w=5 m=8
* RPOLYH Resistor — Node+ Node-
xra1 net3 net4 sky130_fd_pr__res_high_po_1p41 l=7.8 w=1.41 m=1
* CTAT Voltage Generation — Single BJT temperature sweep
.lib "/path/to/eda-technology/sky130/libs/sky130.lib.spice" tt
.global gnd vdd
vdd vdd gnd 2.0
isrc vdd net1 dc 10u
xqp1 gnd net1 net1 sky130_fd_pr__pnp_05v5_W3p40L3p40 m=1
.dc temp -40 125 5
.control
run
plot v(net1)
.endc
.end
* Bandgap Reference — Self-Biased Current Mirror (TT corner)
.lib "/path/to/eda-technology/sky130/libs/sky130.lib.spice" tt
.global gnd vdd
vdd vdd gnd 2.0
* ── PMOS Current Mirror ──────────────────────────────────────────
xmp1 net1 net2 vdd vdd sky130_fd_pr__pfet_01v8_lvt l=2 w=5 m=4
xmp2 net2 net2 vdd vdd sky130_fd_pr__pfet_01v8_lvt l=2 w=5 m=4
xmp3 vref net2 vdd vdd sky130_fd_pr__pfet_01v8_lvt l=2 w=5 m=4
* ── NMOS Source Degeneration ─────────────────────────────────────
xmn1 net1 net1 gnd gnd sky130_fd_pr__nfet_01v8_lvt l=1 w=5 m=8
xmn2 net2 net1 net3 gnd sky130_fd_pr__nfet_01v8_lvt l=1 w=5 m=8
* ── CTAT Branch — Q1 (1×) ───────────────────────────────────────
xqp1 gnd net1 net1 sky130_fd_pr__pnp_05v5_W3p40L3p40 m=1
* ── PTAT Branch — R1 + Q2 (8×) ──────────────────────────────────
xra1 net3 net4 sky130_fd_pr__res_high_po_1p41 l=7.8 w=1.41 m=2
xqp2 gnd net4 net4 sky130_fd_pr__pnp_05v5_W3p40L3p40 m=8
* ── Reference Branch — R2 + Q3 ──────────────────────────────────
xrb1 vref net5 sky130_fd_pr__res_high_po_1p41 l=7.8 w=1.41 m=16
xqp3 gnd net5 net5 sky130_fd_pr__pnp_05v5_W3p40L3p40 m=1
* ── Startup Circuit ──────────────────────────────────────────────
xmp4 net6 net6 vdd vdd sky130_fd_pr__pfet_01v8_lvt l=2 w=5 m=1
xmp5 net7 net6 vdd vdd sky130_fd_pr__pfet_01v8_lvt l=2 w=5 m=1
xmn3 net7 net7 gnd gnd sky130_fd_pr__nfet_01v8_lvt l=7 w=1 m=1
xmn4 net6 net7 gnd gnd sky130_fd_pr__nfet_01v8_lvt l=7 w=1 m=1
.dc temp -40 125 5
.control
run
plot v(vref)
.endc
.end
To run different corners, change only the
.libtag:.lib "...sky130.lib.spice" ff ← Fast-Fast .lib "...sky130.lib.spice" ss ← Slow-Slow
Single BJT — V_BE vs Temperature
V_BE decreases from ~848 mV at −40°C to ~560 mV at +125°C. Slope ≈ −1.88 mV/°C — consistent with theory.
Slope Extraction — Confirming −2 mV/°C
Effect of BJT Multiplicity
With 8 parallel BJTs in branch 2 vs 1 in branch 1, the steeper slope confirms the area ratio effect that the PTAT stage relies on.
Effect of Bias Current
Lower I₀ reduces V_BE and slightly increases the slope magnitude — confirming the theoretical I₀ dependence.
ΔV_BE vs Temperature — Confirming PTAT
Voltage across R1 rises linearly at ~+0.179 mV/°C for N = 8. Purely proportional to absolute temperature as expected.
Slope Verification Against Theory
Measured slope agrees with V_T × ln(8) / ΔT within simulation accuracy.
PTAT with Ideal Current Source
PTAT generation isolated with an ideal current source — confirms the ΔV_BE mechanism independent of the mirror.
Before building the SBCM, the full BGR is validated using a VCVS as an ideal op-amp. This isolates the CTAT+PTAT cancellation from any mirror non-idealities.
V_REF — The Characteristic Bell Curve
V_REF is nearly flat across −40°C to +125°C, centred at 1.2358 V. The slight upward bow is a second-order residual from higher-order temperature terms in I_S — unavoidable without curvature compensation.
Tempco = 33–35 ppm/°C with ideal op-amp.
CTAT and PTAT Overlaid — Slope Match Visualised
Slope Verification at the Operating Point
CTAT/PTAT Balance Confirmed — Equal and Opposite
Without a startup circuit, the SBCM stays at I = 0 — V_REF = 0 V. The degenerate bias point is stable and the circuit never self-starts. This confirms the startup circuit is not optional.
The SBCM forces Vid1 = Vid2 — replicating the ideal op-amp's virtual short. This is the critical check that the SBCM is operating at its intended bias point.
BJT base voltages Vq1 = Vq2 — structural symmetry confirmed:
Equal branch currents — current mirror balance confirmed:
V_REF remains stable as VDD is swept — the SBCM bootstrapping provides first-order VDD rejection.
Internal nodes net1, net2 vs VDD:
Nodes net6, net2 vs VDD:
Branch current stability across the full temperature range:
Full Power-On Transient
VDD ramps from 0 V to 2.0 V at t = 0. The startup circuit detects the zero-current state and injects current, forcing V_REF to settle cleanly. The startup transistor turns off automatically once V_REF is established — visible as the clean flat plateau after ~1.2 µs.
Startup time: < 1 µs
Branch Current — With vs Without Startup
Zero branch current without startup (stuck at degenerate point) vs correct ~10 µA/branch with startup:
Process corners capture the spread of transistor parameters across fabrication runs. The BGR must meet its tempco specification across all corners — not just at nominal.
| Corner | Meaning | V_REF | Tempco | Spec |
|---|---|---|---|---|
| TT | Nominal | ~1.2 V | — | — |
| FF | Fast NMOS + Fast PMOS | ~1.122 V | ~10 ppm/°C | ✅ |
| SS | Slow NMOS + Slow PMOS | within range | ~45 ppm/°C | ✅ |
TT Corner — Nominal 27°C
FF (Fast-Fast) Corner
The bell-curve shape is preserved. V_REF shifts to ~1.122 V due to the changed operating current. Tempco improves to ~10 ppm/°C — best case.
SS (Slow-Slow) Corner
Tempco degrades to ~45 ppm/°C — worst case, but within the 50 ppm/°C specification.
Key observation: The bell curve shape is preserved across all corners — the CTAT+PTAT cancellation mechanism is robust to process variation. Only the absolute V_REF value and the peak temperature shift slightly between corners.
All layout was drawn in Magic VLSI with the Sky130A technology file. The layout follows a bottom-up hierarchy matching the simulation stages.
magic -T /path/to/eda-technology/sky130/tech/magic/sky130A.tech- Common-centroid placement for all matched devices — BJTs, resistors, current mirror FETs
- Guard rings around all device blocks for latch-up prevention and substrate noise isolation
- Dummy devices at array boundaries to ensure uniform process gradients
- Same orientation for matched transistors to cancel systematic gradient effects
R1 and R2 implemented using RPOLYH unit cells with dummy resistors at row ends. The critical parameter is the ratio R2/R1 — both using identical devices ensures the ratio is process-insensitive across corners and temperature.
MP1–MP5 in common-centroid interdigitated layout with a shared guard ring. PFET matching is the dominant factor in current mirror accuracy and directly determines V_REF stability.
MN1–MN4 placed together with a shared n-well guard ring. MN1/MN2 (SBCM) use common-centroid placement; MN3/MN4 (startup, long-channel) are placed adjacently.
All blocks placed and routed together. Floor plan: resistors at top, FETs in middle, BJT array at bottom — minimising interconnect parasitics on the critical matched nodes.
Final layout with V_REF output routed:
# In the Magic Tcl console:
extract all
ext2sim label on
ext2sim
ext2spice scale off
ext2spice hierarchy off
ext2spiceThis produces top.spice — the extracted netlist with parasitic capacitances, used for both post-layout simulation and LVS.
LVS compares the extracted layout netlist against the schematic netlist to confirm that no errors were introduced during physical design.
# Launch Netgen
netgen
# Inside the Netgen console:
lvs "top.spice top" "bgr_lvt_rpolyh_3p40.sp top" \
/path/to/eda-technology/sky130/tech/netgen/sky130A_setup.tcl✅ LVS Passed — All devices match in type, size, and connectivity. No shorts or opens were introduced during layout.
The five most important insights from building this circuit end-to-end:
1. The 1.2 V output is physically anchored to silicon It is not an arbitrary choice — it is the silicon bandgap energy at 0 K. BGRs across different processes and technologies all converge to ~1.2 V because of this fundamental material constant.
2. The SBCM zero-current problem is real and non-trivial A circuit that looks correct on paper will silently stay at 0 V without a startup circuit. This is a classic example of a circuit with multiple stable operating points — simulation without startup confirmed it immediately.
3. R2/R1 ratio matters far more than absolute R values Since both resistors use the same RPOLYH device, their ratio is far more stable across temperature and process than either absolute value. This is a deliberate design choice — the cancellation condition depends only on the ratio.
4. Matching is everything in layout The Tempco achieved in simulation can be completely destroyed by poor layout — mismatched orientations, thermal gradients, or missing guard rings. Common-centroid placement and careful floor planning are as important as the circuit topology itself.
5. Process corners reveal true robustness Simulating only at TT is insufficient. The SS corner (worst tempco, ~45 ppm/°C) is what determines whether the spec is met. The FF corner showing ~10 ppm/°C confirms the cancellation mechanism is working — not just at nominal, but across the full process space.
- VSD — Bandgap Reference Design Workshop
- SkyWater Sky130 PDK Documentation
- Google Sky130 Primitive Devices
- EDA Technology Files for Sky130
- ngspice — Open Source SPICE Simulator
- Magic VLSI Layout Tool
- Netgen LVS Tool
- Razavi, B. — Design of Analog CMOS Integrated Circuits, 2nd ed.
- Banba et al. — "A CMOS Bandgap Reference Circuit with Sub-1-V Operation", IEEE JSSC 1999
Designed and verified using open-source EDA tools and the SkyWater Sky130 open PDK