S-CORE Fortnightly #3247
Replies: 4 comments
S-CORE Fortnightly — 2026-08-24 to 2026-09-06Eclipse S-CORE kept up a steady pace over the past two weeks: more than 20 module releases shipped, over 200 pull requests were merged across dozens of repositories, and community meetings zeroed in on final preparations for the upcoming S-CORE v0.9 release. The headline news is that v0.9 is likely to slip by about a week while the team finishes a handful of module updates and irons out a new integration workflow (DR8). Alongside the release push, several modules adopted a shared, unified code-coverage pipeline, and the community continued discussing how AI-generated code should be reviewed and used going forward. Overall momentum remains high, with steady contributions and no breaking surprises for downstream users. Highlights
What this means for adopters
Releases at a glance
Community pulseOver the two weeks, community meetings covered a broad range of topics: testing conventions, Rust safety-critical coding guidelines, a base-libraries release for the upcoming S-CORE version, the Technical Lead Circle's v0.9 release checklist, an architecture decision on file/path name collisions, safety-requirements work for the Time feature, and a Persistency feature team working through its backlog. Roughly 15 community meetings posted minutes in this window, more than 200 pull requests were merged, over 20 module releases shipped, and several hundred issues were opened and closed (much of the closures tied to historical process-template cleanup). No meetings or discussions took place during a quiet 2026-08-28 to 2026-08-29 weekend. Watch list
Glossary
FooterS-CORE Fortnightly is generated automatically from the S-CORE Daily issues of this period; those in turn come from public eclipse-score activity. Links go to the sources; corrections welcome as replies. |
S-CORE Fortnightly — 2026-09-07 to 2026-09-20The two weeks in one paragraphEclipse S-CORE kept up a steady release cadence over the past two weeks, publishing eight module releases — including the headline Highlights
What this means for adopters
Releases at a glance
Community pulseCommunity meetings met roughly two dozen times across recurring groups, including Infrastructure, Technical Lead Circle, Architecture, Release Community, Security & Crypto, Testing, Base Libs, Persistency, Time, Logging, Communication, and the SW Dev Process / Safety Team. Discussion shifted from wrapping up the v0.9 release (release notes, lessons learned, patch alignment) toward process changes: the coverage-tool split, a proposal to adopt Rust Edition 2024, a Rust-certification gap analysis for ISO 26262 compliance, and the new two-week integration cadence. Roughly 220 pull requests were merged and about 130 issues opened across the organization in this window, alongside the eight releases listed above. Watch list
Glossary
FooterS-CORE Fortnightly is generated automatically from the S-CORE Daily issues of this period; those in turn come from public eclipse-score activity. Links go to the sources; corrections welcome as replies. |
S-CORE Fortnightly — 2026-09-21 to 2026-10-04The two weeks in one paragraphOver these two weeks the Eclipse S-CORE community merged roughly 260 changes and published twelve releases, most of them in the supporting tools used to build, document and measure the quality of S-CORE modules. A major theme was making test coverage and verification evidence more complete, including coverage measurement on QNX (a commercial real-time operating system used in vehicles). The communication module reached version 0.5.0, though it is explicitly not for production use yet. One release removed deprecated build aliases and is flagged as a breaking change, which sparked a community discussion on how modules should adapt to deprecations. Overall momentum was steady, with a lot of cleanup and preparation work ahead of the 0.10 and 1.0 milestones. Highlights
What this means for adoptersFacts
What to check on your side
Releases at a glance
Community pulseMeetings were recorded for the Architecture, Infrastructure, Release, Testing and SW Dev Process communities, the Technical Lead Circle, and the Base Libs, Security & Crypto, Time and Persistency feature teams (plus a weekly Rust sync), roughly 20 sets of minutes in the eight daily issues covering the period. Some days were combined, so counts are approximate. Notable items:
Activity: about 260 merged changes across the eight daily issues (typically 18–45 per issue), twelve releases, and well over 100 issues opened. Watch list
Glossary
S-CORE Fortnightly is generated automatically from the S-CORE Daily issues of this period; those in turn come from public eclipse-score activity. Links go to the sources; corrections welcome as replies. |
S-CORE Fortnightly — 2026-10-05 to 2026-10-18The two weeks in one paragraphOver these two weeks S-CORE shipped around a dozen releases, including two shared building blocks that come with breaking changes, and the first release of a new module for AI-assistant tooling. A first module for building against the QNX software platform also appeared. Day-to-day work centred on safety documentation, code-quality clean-ups and making test and coverage reporting more complete, with well over 300 changes merged. Community meetings kept a steady rhythm, with preparation for an audit in early November and discussions about the v1.0 release visible in the minutes. Highlights
What this means for adoptersFacts
What to check on your side
Releases at a glance
Community pulse
Watch list
Glossary
S-CORE Fortnightly is generated automatically from the S-CORE Daily issues of this period; those in turn come from public eclipse-score activity. Links go to the sources; corrections welcome as replies. |
Uh oh!
There was an error while loading. Please reload this page.
This thread collects S-CORE Fortnightly — every two weeks: what happened in Eclipse S-CORE, in plain language for technical and non-technical readers.
Each issue is posted as a comment below, so subscribe to this discussion to get every new issue as a notification. Generated automatically from public eclipse-score activity; every item links to its source. Corrections and feedback welcome as replies.
All reactions